Northern Baffin Island, Nunavut
Client: Baffinland Iron Mines Corporation
Project Description
Baffinland Irons Mines Corporation awarded Ruskin Construction the design-build contract to construct an iron ore loading dock for the Mary River Project on the Northern end of Baffin Island. Working in conjunction with our design engineers, PND Engineers Canada, Inc., Ruskin took on this ambitious project in Canada’s Arctic working in average winter temperatures of below -30° Celsius, and in 24-hour darkness from November to January.
Due to the location, this project required extensive logistical planning to ensure all equipment and materials were shipped in the short ice-free season (July – September).
Our scope included the design, assembly and construction of OPEN CELL® marine structures for the ore dock, mooring facilities, shiploader and material handling conveyor system foundations, as well as the installation of appurtenances at Milne Inlet capable of supporting ship loading equipment sized to load ocean-going ore carriers ranging in size from Supramax to Post Panamax vessels.