Prince George, BC
Client: Ministry of Transportation and Infrastructure
Project Description
Ruskin Construction was contracted by the Ministry to replace the bridge deck and install major steel components to reinforce this 390‐meter combined Truss / Concrete Bridge Structure.
The work also included two approaches with the south span being located over one of the busiest CN Rail yards. The north approach span crosses a major connection road in the City of Prince George and got replaced with only one 24‐hour closure window!